Procedures and training

Written once. Followed every time.

Two working documents for an invented contractor: the quality check every finished room passes before the client sees it, and the first two modules of the sales training track. Every name and number is invented.

First-pass rate
91%
Up 13 points in eight weeks
Rooms checked this week 46of 46 Every finished room, before handoff
Rework rechecked in 1.6days Goal is 2 working days or less
Reps in sales training 3reps Session 2 of 6 this week
Document 01, procedureRevision 4

Quality check before handoff

How a finished room passes from the install team to the client. Every room gets a written check before anyone calls it done. A new project coordinator reads this on day one.

Owner
Project coordinator
Applies to
Every finished room
Reports to
Operations manager
Reviewed
Every quarter

1Purpose and scope

A punch item found after handoff costs more than one caught before it. This check finds the small misses while the team is still on site: a missed coat, a loose cover plate, a door that sticks.

It covers painting, drywall, carpentry, flooring and trim. Structural, electrical and plumbing work have their own inspections.

Who decides what. The coordinator checks and records. The site lead still runs the schedule and assigns the rework.

2Who does what

Project coordinatorWalks each finished room, logs any miss with a photo and signs the clearance.
Site leadAssigns the rework and says when a room is ready for a second look.
Operations managerReads the Friday summary and settles any disagreement.

3The four steps

  1. Walk the room within one working day of the finish. Use the checklist for each trade and take one photo per wall.

    Trade checklist4 photos minimum
  2. Mark each miss with blue tape and a short note. Log it with the room number, the trade and a photo.

    Room numberTradePhoto
  3. Recheck the rework within two working days. Clear an item only when it is fixed.

    Before and after photo
  4. Sign the clearance. A room goes to the client only with a signed clearance.

    Signed clearance

4How it is measured

First-pass rate, last 8 weeksGoal 90%
Punch items this week, by trade16 items, 4 rooms

5Standards

StandardExpectationWhy it matters
CoverageEvery finished room checked before handoffA miss the client finds costs more to fix
PhotosFour or more per room, filed the same dayA photo settles questions later
ReworkRechecked within two working daysOpen items slow down the next room
SummarySent by Friday at 3 PMThe team sees a trend while it is small

6Records

  • PhotosAt least four per room, named with the room number.
  • Friday summaryMisses by trade, the first-pass rate and rework time.
  • StorageKept for three years in the job folder.
The rule If it isn't right, it doesn't get signed.

A room handed over without a signed clearance goes to the operations manager the same day.